Application Guide
Before you begin:
✅Weather is dry (no rain forecast for the next 2 hours)
✅Existing surface is dry and swept or blown clean of loose debris (broom, leaf blower, etc.)
✅Reclaimed Asphalt Pavement (RAP) millings are dry and screened as needed. Recommend removing dirt and uncoated stone
✅Surface and ambient temperature is above 50°F (10°C)
✅PPE is available (gloves, safety glasses, high-visibility gear, close-toed shoes)
✅Activate product, undiluted, in volumes appropriate for the project. Activate application range is between 3/4 gallons to 1-1/4 gallons per 2000 pounds of RAP
✅Activate is shaken or mixed thoroughly before application
- 15 minutes for 275-gallon totes
- 7-8 minutes for 55-gallon drums
- 1-2 minutes for 5-gallon pails and 1-gallon jugs
- 30 seconds for 1-quart bottles
✅Supporting Products: BR-3600, Activate Cleaner, BioTak-4600, RePlay
✅Traffic control plan in place (cones, flaggers, signage as needed) and caution is practiced around vehicles and pedestrians
Method 1: Small Batch Mixing
What You Need:
- A clean mechanical mixing barrel (e.g. cement mixer) or heavy-duty container (e.g. skid steer bucket, wheelbarrow)
- Shovel or similar tool for churning by hand, wheelbarrow or vehicle to transfer to site
- Activate product, undiluted
- Measuring tools, such as a marked gallon container
- Compaction tool, such as tamper or vibratory plate

Steps:
- Site Prep: Sweep or blow off all loose debris. Blot the existing surface using a towel to make sure the surface is dry.
- Pavement Temperature: Use a temperature gun to gauge the surface and make sure it is above 50°F
- Equipment Prep: It is recommended to spray a single coat of BR-3600, undiluted, to the mixing container prior to adding RAP and Activate for easier cleanup
- Load the measured volume of RAP into the mixing barrel, scoop, or container
- Measure and pour the required amount of Activate based on target dosage (gallons per ton of RAP). May also spray Activate to the RAP millings when measured appropriately.
- If using a barrel mixer: Run the mixer for 3–5 minutes, or until the RAP is fully coated and loosened.
- If mixing by hand: Use a shovel or similar tool to churn the RAP and Activate thoroughly inside the container or scoop. Continue mixing until evenly coated.
- Inspect blend for even distribution; eliminate dry sections or break down larger clumps.
- Allow mixture to sit for 15-20 minutes for Activate to spread further and begin rejuvenation.
- Transfer Activate RAP mixture to the project site. It is recommended to apply BioTak-4600 to existing asphalt surfaces prior to placing Activate RAP for better bonding.
- Compact in place using a vibratory plate, hand tamper, or vehicle driving over (depending upon Activate RAP patch size and shape)
Method 2: Large Batch Mixing
What You Need:
- A clean mechanical mixer, such as a pugmill or other continuous mixing equipment
- Activate product, undiluted
- Measuring method, such as flow rate controls (for spray application) or measured containers
- Hauling equipment to transfer mix to the site
- Compaction tools, such as vibratory rollers
Steps:
- Site Prep: Sweep or blow off all loose debris on existing asphalt. Blot the surface using a towel to make sure the surface is dry.
- Pavement Temperature: Use a temperature gun to gauge the surface and make sure it is above 50°F
- Equipment Prep: It is recommended to spray a single coat of BR-3600, undiluted, to mixers, hauling equipment and loaders prior to adding RAP and Activate for easier cleanup.
- Load the measured volume of RAP into the pugmill or other mechanical mixer.
- Measure and pour the required amount of Activate based on target dosage (gallons per ton of RAP). May also spray Activate to the RAP millings on a feeding belt when measured appropriately or auto adjusted using belt scales.
- Inspect the blend for even distribution and make sure the RAP is fully coated with Activate. Eliminate dry sections or break down larger clumps if present.
- Allow mixture to sit for 15-20 minutes for Activate to spread further and begin rejuvenation.
- Transfer Activate RAP mixture to the project site. It is recommended to apply BioTak-4600 to existing asphalt surfaces prior to placing Activate RAP for better bonding.
- Compact in place using a steel vibratory roller.
Cleanup & Aftercare
- Wait 3 hours for Activate to completely cure once compacted
- For improved bonding and rejuvenation, it is recommended to treat the compacted Activate RAP surface with RePlay
- Clean all tools and equipment immediately after use to prevent buildup or clogging.
- For Easy Release: Coat mixing barrels, scoops, and loader buckets with BR-3600 before loading and mixing to reduce adhesion.
- For Equipment Cleanup: Use Activate Cleaner (undiluted) to flush or wipe down equipment that has contacted Activate.
- Store remaining Activate in a sealed container, out of direct sunlight and away from freezing temperatures.
- Store any remaining BioTak, BR-3600, RePlay, and Activate Cleaner in their original containers.